Skip to product information
1 of 1

Golden Bridge

Golden Bridge ER308 (JQ-MH308) Submerged Arc Welding Wire

Golden Bridge ER308 (JQ-MH308) Submerged Arc Welding Wire

SKU:JQ-MH308-1/8-0055

Diameter
Package
View full details

JQ-MH308




JQ-MH308 is a submerged arc welding wire of 21Cr-10Ni austenitic stainless steel, which has excellent welding performance with effortless slag removal ability, optimal bead appearance and good crack resistance. The deposited metal presents good mechanical properties and weld intercryctalline corrosion resistance



Working with the sintered-flux JQ-SJ601, the product is applicable for the welding of 12Cr18Ni9 and 06Cr19Ni10 . It is commonly used in the fields such as petrochemical industry, pressure vessel, food and medical treatment, construction machinery, nuclear power and so on.

Chemical components of welding wire (%)

Item
C
Mn
Si
Cr
Ni
P
S
Example value 0.056 1.43 0.30 19.81 9.45 0.021 0.006
 

Chemical components of deposited metal (with flux: JQ-SJ601) (%)

Item
C
Mn
Si
Cr
Ni
P
S
Example value 0.030 1.23 0.47 19.20 9.42 0.025 0.013
 

Mechanical properties of deposited metal

Test item
Rm(MPa)
A(%)
Combined welding-flux
Example value 590 42 JQ-SJ601
 

Reference current (AC, DC+)

Diameter (mm)
Φ2.5
Φ3.2
Φ4.0
Φ5.0
Welding current(A) 400-500 450-550 500-600 550-650
 




1. It is suggested that the temperature between gaps should be controlled at about 150℃. Pay attention to control the heat input when welding multi-gap and multi-layer in small and medium specifications.
2. The rust layer, moisture, oil stain, dust, etc. on the welding part shall be clearly removed.
3. The welding-flux must be baked at 300-350℃ for 2 hours before use.
The above suggestions are for reference only, and specific operation should be made according to the onsite conditions. When necessary, conduct process evaluation before determining the welding scheme.


What you cover in your shipping policy and how you communicate it will be highly dependent on your current business operations and supply chain. The goal is to be transparent with customers.

As 2020 brings unforeseen shipping delays and increased carrier costs, it's more important than ever to keep your shipping policy up to date with the following key points in mind:

  • Essential shipping details are easy to find. While it is common practice to keep a link to your shipping policy page in the footer of your website, consider how you can also surface important shipping details in the right place at the right time (e.g. on your product page or website banner).
  • Clear and concise presentation. Don’t make customers comb through your shipping policy page for the information they need. Whenever possible, make it easy to navigate with clear subheadings, tables, bolded text, and links to learn more.
  • Order processing times. After an order is placed, how many days will it take to get it ready to ship? It’s worth communicating if you’re excluding weekends and/or holidays, and if you have certain cutoff times for processing orders (e.g. orders received after 5pm will be processed the next business day). If changes occur within your supply chain, due to peak periods or as a result of COVID-19, you should update your processing times to reflect it.
  • Domestic and international shipping options. What are the qualifying regions for your domestic shipping options? International shipping can be broken down in its own section where you list the countries you ship to and estimated delivery timelines. If you offer several shipping options, you can list them in a table so the information is easy to scan. Shipping costs. Break down your shipping costs for the customer. If you have a free shipping threshold, you can communicate in various places as an incentive for customers. Any potential surprise fees should be surfaced too, such as duties and taxes the customer may incur.
Diameter

* 1/8 inches (3.2 mm), * 5/32 inches (4.0 mm)

Package

55 lb (25 kg), 110 lb (50 kg), 220 lb (100 kg), 440 lb (200 kg), 550 lb (250 kg), 660 lb (300 kg), 770 lb (350 kg)